GE Wellstream contracted PDi to provide project management and engineering support for the planning and execution of the project which included the installation of 8No. mid water arches, 12No. flowlines and 4No. umbilicals.
The OSX 3 Tubarao Martello field is located in the Campos Basin in block BM-C-40 offshore Brazil approximately 94km off the coast of Rio de Janeiro. The field is in 105m of water and consists of 4 wells tied back to the OSX3 FPSO.
PDi’s scope comprised of the following elements:
GE Wellstream
Brazil
January 2013 (13 months)
Download Full case studyTo discuss similar projects performed by PDi and any related requirements that you have, please contact us.